Completion of Carehome for Clegg Construction

We have been pleased to part of the design team for the new Care Home, Lonsdale Mews for Care UK.

We provided a variety of services for the project including Structural Engineering, Highways & Infrastructure, Flood Risk & Drainage and Temporary works.

The structural deign of two storey Care home was a traditional load bearing masonry construction with piled foundations, precast floors and timber trussed roof.

Our Engineers have shared some insights on the project below-

As the site was built over a historic landfill there had to be careful consideration required to ensure structural details were coordinated with gas protection requirement.

All foundations and drainage to be set as shallow as practical to limit export.

A detailed cut and fill analysis was required to negate requirement for removal of landfill material from site.

Our team also undertook the design and detailing of new S104 foul and surface water sewers and also the drainage and external works including detailing of appropriate Suds.

It was great to be a part of the design team and look forward to future work with the team!